Small-business inspection relief is extended past the scheduled 2027 wave
50% 0 pppossible · rising · conditional p
by 19 Nov 2028
Falsified if
the 2027 inspection wave proceeds on schedule with no further moratorium
Conditional chain
IF it lands: this arc follows at conditional 50% → 40% effective (50% × 80%)
THIS ARC · Sleeping — waiting on its parent
Small-business inspection relief is extended past the scheduled 2027 wave
conditional p = 50% · effective 40%