Activeorganic sweepSituation
China-Europe Railway Express expansion faces capacity and geopolitical constraints
70%likely · rising
d365 window expected by 17 Nov 2027
Falsified if
geopolitical disruptions or infrastructure bottlenecks reduce growth
Chain map
The whole chain from its root — pan, zoom, click an arc to open it. The number on each card is its effective probability: the root's p multiplied by every conditional p along the path.
Conditional chain
Follow-ons priced given this arc comes true — asleep until it resolves.
IF this arc lands: the follow-on follows at conditional 60% → 42% effective (60% × 70%)
Sleeping — waiting on its parent · wake-or-kill by 17 Nov 2027
European importers face higher freight costs and longer lead times on China-Europe rail conditional p = 60% · effective 42%