← Trajectory catalog

Banks build 2027 withholding infrastructure without a transitional phase-in

60% 0 pppossible · rising · conditional p
by 26 Feb 2027
Falsified if

the second reading reinstates a phased 13% transitional year

Conditional chain
IF it lands: this arc follows at conditional 60% → 36% effective (60% × 60%)
THIS ARC · Sleeping — waiting on its parent

Banks build 2027 withholding infrastructure without a transitional phase-in

conditional p = 60% · effective 36%

Grounded on