← Trajectory catalog

Grid operators and industrial buyers lock in winter supply contracts ahead of the emergency law

60% 0 pppossible · rising · conditional p
by 19 Jan 2027
Falsified if

the draft law stalls in cabinet or parliament before the winter peak

Conditional chain
IF it lands: this arc follows at conditional 60% → 42% effective (60% × 70%)
THIS ARC · Sleeping — waiting on its parent

Grid operators and industrial buyers lock in winter supply contracts ahead of the emergency law

conditional p = 60% · effective 42%

Grounded on