---
title: "Cabinet approval of Data Center regulatory criteria and 20 MW industrial estate threshold — DecisionGateway"
description: "A cluster of decision records shows a cabinet approving rules and classification criteria for data centres, including a seven-category DC classification and a 2"
canonical_url: "https://dgw.tmarket.io/situations/01a1e403-f247-7ce8-9d88-783e32f9bc1e"
meta:
  "og:description": "A cluster of decision records shows a cabinet approving rules and classification criteria for data centres, including a seven-category DC classification and a 2"
  "og:image": "https://dgw.tmarket.io/og.jpg"
  "og:image:alt": "White network of connected nodes crossed by a timeline on black"
  "og:image:height": "1024"
  "og:image:width": "1024"
  "og:title": "Cabinet approval of Data Center regulatory criteria and 20 MW industrial estate threshold — DecisionGateway"
  "twitter:image": "https://dgw.tmarket.io/og.jpg"
---

> Index of every page on this site: [llms.txt](https://dgw.tmarket.io/llms.txt)

**Situation **/Regulatory pressure/no dates

**Active**

# **Cabinet approval of Data Center regulatory criteria and 20 MW industrial estate threshold**

A cluster of decision records shows a cabinet approving rules and classification criteria for data centres, including a seven-category DC classification and a 20 MW threshold requiring larger data centres to locate in industrial estates. The members describe the same regulatory action from slightly different angles: general approval of criteria, the classification scheme, and the siting threshold.

6 members/0 actors/recorded 16 Nov 2026

Trajectories

Sign-in readers can mine up to three arcs for this record.

[**Sign in to get trajectories **](https://dgw.tmarket.io/login?redirect=/situations/01a1e403-f247-7ce8-9d88-783e32f9bc1e)

## **Members**

6

Attached by part\_of; a later discovery pass can detach a member.

[**Decision**/Adopt law**Adopted****Cabinet approves criteria for regulating Data Centers**](https://dgw.tmarket.io/decisions/01a1e3fa-5410-7efe-8e40-78d9c2d1e7c0) [**Decision**/Regulate**Adopted****Cabinet approves criteria for regulating Data Centers**](https://dgw.tmarket.io/decisions/01a1e3fc-3f85-7ed0-bc25-7c6469753a81) [**Decision**/Adopt law**Adopted****Cabinet approves regulatory criteria for Data Center**](https://dgw.tmarket.io/decisions/01a1e3f9-0f61-7353-9397-1b0a62cf7011) [**Decision**/Adopt law**Adopted****Cabinet approves rules governing data centres and a 7-category DC classification**](https://dgw.tmarket.io/decisions/01a1e3f5-d4bc-7377-8461-4b33f7232be1) [**Decision**/Regulate**Adopted****Cabinet sets 20 MW threshold: Data Centers above 20 MW must locate in industrial estates**](https://dgw.tmarket.io/decisions/01a1e3ff-0112-7755-b6e5-0c3d86c146c9) [**Decision**/Regulate**Adopted****Cabinet sets 20 MW threshold requiring Data Centers to locate in industrial estates**](https://dgw.tmarket.io/decisions/01a1e3fa-5422-77c4-bcd8-0324d8f97814)

## **Source**

No source quote is linked to this record.

## **Related situations**

Same kind only, ranked by embedding similarity to this record.

[All situations](https://dgw.tmarket.io/situations) [API record](https://dgw-api.tmarket.io/v1/situations/01a1e403-f247-7ce8-9d88-783e32f9bc1e)

```json
{"@context":"https://schema.org","@graph":[{"@id":"https://dgw.tmarket.io/#website","@type":"WebSite","description":"Decisions, events and falsifiable forecasts from 4,500+ Telegram channels — every claim cited. Read free.","name":"DecisionGateway","url":"https://dgw.tmarket.io/","publisher":{"@id":"https://dgw.tmarket.io/#identity"}},{"@id":"https://dgw.tmarket.io/situations/01a1e403-f247-7ce8-9d88-783e32f9bc1e#webpage","@type":"WebPage","description":"A cluster of decision records shows a cabinet approving rules and classification criteria for data centres, including a seven-category DC classification and a 2","name":"Cabinet approval of Data Center regulatory criteria and 20 MW industrial estate threshold — DecisionGateway","url":"https://dgw.tmarket.io/situations/01a1e403-f247-7ce8-9d88-783e32f9bc1e","breadcrumb":{"@id":"https://dgw.tmarket.io/situations/01a1e403-f247-7ce8-9d88-783e32f9bc1e#breadcrumb"},"isPartOf":{"@id":"https://dgw.tmarket.io/#website"},"potentialAction":[{"@type":"ReadAction","target":["https://dgw.tmarket.io/situations/01a1e403-f247-7ce8-9d88-783e32f9bc1e"]}]},{"@id":"https://dgw.tmarket.io/#identity","@type":"Organization","name":"DecisionGateway","url":"https://dgw.tmarket.io"},{"@id":"https://dgw.tmarket.io/situations/01a1e403-f247-7ce8-9d88-783e32f9bc1e#breadcrumb","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","name":"Home","item":"https://dgw.tmarket.io","position":1},{"@type":"ListItem","name":"Feed","item":"https://dgw.tmarket.io/feed","position":2},{"@type":"ListItem","name":"Cabinet approval of Data Center regulatory criteria and 20 MW industrial estate threshold","position":3}]}]}
```

## Sitemap

See the full [sitemap](https://dgw.tmarket.io/sitemap.md) for all pages.
