---
title: "With these funds, construction-repair and improvement works are planned to be carried out at 445… — post author — DecisionGateway"
description: "statement by post author, recorded 2026-11-10 — verbatim quote and source citation."
canonical_url: "https://dgw.tmarket.io/claims/01a1d038-011a-7ce7-a8c0-dce8bddfd8e1"
meta:
  "og:description": "statement by post author, recorded 2026-11-10 — verbatim quote and source citation."
  "og:image": "https://dgw.tmarket.io/og.jpg"
  "og:image:alt": "White network of connected nodes crossed by a timeline on black"
  "og:image:height": "1024"
  "og:image:width": "1024"
  "og:title": "With these funds, construction-repair and improvement works are planned to be carried out at 445… — post author — DecisionGateway"
  "twitter:image": "https://dgw.tmarket.io/og.jpg"
---

> Index of every page on this site: [llms.txt](https://dgw.tmarket.io/llms.txt)

statementSaid on 2026-11-10

# **With these funds, construction-repair and improvement works are planned to be carried out at 445 infrastructure facilities.**

A statement by post author, said on 2026-11-10. Statements are as reported by the cited publishers — not verified by DecisionGateway.

> *Mazkur mablağlar hisobidan 445 ta infratuzilma obyektida quriliş-ta’mirlaş va obodonlaştiriş işlarini amalga oşiriş közda tutilgan.*

minecofinuzPublished 2026-11-10 [ Read source](https://t.me/minecofinuz/17428)

## **Related claims**

[**In 2026, construction of 33,926 apartments in 61 massifs is planned, and as of 1 October 13,408 apartments had been handed over for use.**post author · prediction](https://dgw.tmarket.io/claims/01a1d04b-e1dd-7fca-9ca0-cb35b110a3ff) [**In 2026, 1 trillion söm was allocated from the republic budget to create the necessary infrastructure for 293 "driver" projects that stimulate entrepreneurship development in industry, agriculture and services in the regions.**post author · statement](https://dgw.tmarket.io/claims/01a1d038-00e9-7815-b5d2-f3c7a00d361e) [**Additional 6.5 trillion from the National Fund are planned to be sent to "Народную стройку".**Мы · statement](https://dgw.tmarket.io/claims/01a1d2f1-3e6b-725a-8907-18e745ac7f87) [**State infrastructure loans are needed to create conditions for attracting investment in the construction of engineering networks and roads.**Владимир путин · statement](https://dgw.tmarket.io/claims/01a1ce92-0414-7aac-9875-6e9006b3dba0) [**Key work remains, with the transfer facilities about 60% complete, although the overall reconstruction project has reached 80%.**post author · statement](https://dgw.tmarket.io/claims/01a1d01f-5f93-7548-a4ab-ec78206f072c) [**According to the President, possible targets of a new operation include power plants and bridges; he mentioned 38 bridges but said they should not be destroyed.**პრეზიდენტის განცხადებით · statement](https://dgw.tmarket.io/claims/01a1d06b-306c-7244-90e8-24597768ed9c)

[All claims](https://dgw.tmarket.io/claims)

```json
{"@context":"https://schema.org","@graph":[{"@id":"https://dgw.tmarket.io/#website","@type":"WebSite","description":"Decisions, events and falsifiable forecasts from 3,000+ Telegram channels — every claim cited. Read free.","name":"DecisionGateway","url":"https://dgw.tmarket.io/","publisher":{"@id":"https://dgw.tmarket.io/#identity"}},{"@id":"https://dgw.tmarket.io/claims/01a1d038-011a-7ce7-a8c0-dce8bddfd8e1#webpage","@type":"WebPage","description":"statement by post author, recorded 2026-11-10 — verbatim quote and source citation.","name":"With these funds, construction-repair and improvement works are planned to be carried out at 445… — post author — DecisionGateway","url":"https://dgw.tmarket.io/claims/01a1d038-011a-7ce7-a8c0-dce8bddfd8e1","breadcrumb":{"@id":"https://dgw.tmarket.io/claims/01a1d038-011a-7ce7-a8c0-dce8bddfd8e1#breadcrumb"},"isPartOf":{"@id":"https://dgw.tmarket.io/#website"},"potentialAction":[{"@type":"ReadAction","target":["https://dgw.tmarket.io/claims/01a1d038-011a-7ce7-a8c0-dce8bddfd8e1"]}]},{"@id":"https://dgw.tmarket.io/#identity","@type":"Organization","name":"DecisionGateway","url":"https://dgw.tmarket.io"},{"@id":"https://dgw.tmarket.io/claims/01a1d038-011a-7ce7-a8c0-dce8bddfd8e1#breadcrumb","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","name":"Home","item":"https://dgw.tmarket.io","position":1},{"@type":"ListItem","name":"Claims","item":"https://dgw.tmarket.io/claims","position":2},{"@type":"ListItem","name":"With these funds, construction-repair and improvement works…","position":3}]},{"@id":"https://dgw.tmarket.io/claims/01a1d038-011a-7ce7-a8c0-dce8bddfd8e1#/schema/quotation/1","@type":"Quotation","dateCreated":"2026-11-10","isBasedOn":"https://t.me/minecofinuz/17428","text":"Mazkur mablağlar hisobidan 445 ta infratuzilma obyektida quriliş-ta’mirlaş va obodonlaştiriş işlarini amalga oşiriş közda tutilgan.","url":"/claims/01a1d038-011a-7ce7-a8c0-dce8bddfd8e1"}]}
```

## Sitemap

See the full [sitemap](https://dgw.tmarket.io/sitemap.md) for all pages.
